Gallery

Prof Joby Boxall & Dr Stewart Husband

Flushing operations

Flushing with Severn Trent Water (2006).

Flushing with Yorkshire Water (2005).

Red Water' – flushing an iron main (2005).

Iron pipe section removed showing tuberculation, Anglian Water (2004).


Laboratory pipe rig

Pilot laboratory pipe loop, constructed in 2003,
Department of Civil and Structural Engineering, University of Sheffield.

Development of the pipe loop, 3 x 200m sections (November 2007).

Pipe loop in operation (August 2008).