Gallery
Gallery
Prof Joby Boxall & Dr Stewart Husband
Flushing operations
Flushing operations
Flushing with Severn Trent Water (2006).
Flushing with Yorkshire Water (2005).
Red Water' – flushing an iron main (2005).
Iron pipe section removed showing tuberculation, Anglian Water (2004).
Laboratory pipe rig
Laboratory pipe rig
Pilot laboratory pipe loop, constructed in 2003,
Department of Civil and Structural Engineering, University of Sheffield.
Development of the pipe loop, 3 x 200m sections (November 2007).
Pipe loop in operation (August 2008).